Harm No. 5 of Kanban Column WIP Limits: Loss of Focus - The TameFlow Chronologist


#1
Harm No. 5 of Kanban Column WIP Limits: Loss of Focus less than 1 minute read Column WIP limits… … divert focus away from the real constraint, and divert attention away from the throughput of the entire system. Without the right focus, there is no leverage. Quoted from: Tame the Flow. Share on Twitter Facebook Google+ LinkedIn

This is a companion discussion topic for the original entry at https://chronologist.com/blog/2013-09-30/harm-5-of-kanban-column-wip-limits-loss-of-focus/